Set out what your standby sets need over a year, and send the result with your request. It is a scope to quote against, not a quote, and it shows no prices.

How many sets are on the site?
set(s), up to 10
Size of the largest set
Service visits a year, per set

One major and one minor per set (the tender minimum)

Yearly load bank test
Fuel
Changeover panels to test
panel(s)
When can the work happen?

Your scope for a year

1 set, 30 to 100 kVA

    A scope to send, not a quote. The engineer prices it after seeing the site.

    What the engineer will price from this

    Every line in the scope changes the work, and so the price. Bigger sets take more consumables and time. More sets mean more visits. A load bank test needs equipment brought to site and a few hours of running. Fuel polishing depends on how much fuel there is and what state it is in.

    Then there are the things a form can’t see. Access to a basement or roof plant room, escorts on a secure site and work at night all add time. That is why you should expect the engineer to visit or ask for photos before putting a figure in writing.

    If you aren’t sure about any line, leave it at the usual setting. The engineer will tell you what your sets actually need.

    About the scope builder

    Why doesn’t the builder show a price?

    Because no official or trade body publishes generator servicing rates, and engineers price each set after a survey. A clear scope is what makes the quotes you receive comparable.

    Where does the two-visit pattern come from?

    From a public tender for standby generator maintenance (Contracts Finder, August 2021), which set two visits a year per set as the minimum, one major and one minor, with a yearly four-hour load bank test up to 110% of full load.

    What if I don’t know the size of the set?

    Look for the rating plate on the alternator or canopy, which gives the output in kVA. If you cannot find it, choose the nearest band and say so in the notes.

    Can I change the scope once an engineer has seen the site?

    Of course. The brief is a starting point. The engineer may suggest more visits, a fuel test or a transfer test once they have seen the set.

    Sources for this page

    Ask for a quote for your generator

    We look for one service engineer who works in your area and tell you who they are before any of your details go to them. You pay nothing for this.

    1. You tell us where the set is and what it needs.
    2. We name an engineer who covers your site.
    3. You say yes or no before your details are passed on.
    4. They quote in writing, directly to you.

    Step 1 of 3

    Where is the generator?
    Get a quote