Automatic Transfer Switch Servicing and Fitting

An automatic transfer switch, or ATS, is the panel that notices the mains has gone, starts the generator and moves the building across. If it fails, a perfectly good set can run while the lights stay off.

It is serviced alongside the set, tested under real conditions and replaced when it no longer suits the building it serves.

Get a quote
Job
Starts the set and moves the load
Must prevent
Feeding back into the network
Standard
BS 7671, Section 551

What the switch does in a power cut

The sequence below is the general pattern for an automatic changeover. The delays between stages are adjustable and set for each site, which is why we have not put times on it.

The six stages an automatic transfer switch goes through in a power cut1Mains fails

The panel senses the supply has gone.

2Set starts

The generator is signalled to run.

3Supply settles

Voltage and frequency come up to level.

4Load transfers

The switch moves the building onto the set.

5Mains returns

After a set delay, the load moves back.

6Cool-down

The set runs on unloaded, then stops.

The general sequence for an automatic changeover. The delays at each stage are set on your own panel; ask your engineer for the settings on yours.

Manual changeover or automatic?

A manual changeover switch is a lever someone has to throw. It suits a farm or a small business where a short gap in supply is acceptable and someone is always nearby. An automatic switch does the same job without anyone on site, which is why hospitals, data rooms and care homes use them.

Either way, the switch has one safety job that matters above everything else. It has to keep the generator and the mains apart, so the set can never feed back into the network.

The rules behind it

The wiring regulations, BS 7671, have a section (551) on low voltage generating sets, including the arrangements that stop a standby set running in parallel with the public supply. Where a set is designed to run in parallel, even for a moment to avoid a break, the network operator’s rules in Engineering Recommendation G99 apply too.

And because the panel is part of your electrical system, the duty in regulation 4 of the Electricity at Work Regulations 1989 to maintain it so it does not cause danger applies here as much as to the set.

What to ask for when it is serviced

Ask your engineer to cover the switch as well as the set, and to write down what they did. These are the points worth raising.

  • A real transfer test, with the building load moved onto the set and back, at a time you agree.
  • The settings on the panel, recorded so they can be checked against what the site needs.
  • Signalling between the switch and the set, including remote alarms if you have them.
  • Condition of contacts and connections, which can heat up over time.

NHS sites have their own guidance on testing emergency power, set out in HTM 06-01 in England and SHTM 06-01 in Scotland. If you run a healthcare building, your engineer should work to it.

When a switch needs replacing

You may find a switch needs replacing when the building has grown past it, when parts are no longer made, or when a bigger set goes in. An engineer will look at the rating of the switch against the load it now carries and quote for a replacement if it falls short.

How the job gets done

  1. Tell us about the panel

    Manual or automatic, the set size and what the building runs on it.

  2. Panel details

    The engineer notes the make, rating and controller of the switch before visiting.

  3. Inspect and test

    They check the switch and agree a time for a transfer test.

  4. Report and quote

    Findings in writing, with a price for any repair or replacement.

Changeover and ATS: questions

What is an automatic transfer switch?

A panel that senses when the mains supply fails, signals the standby set to start, and moves the building load onto the set once it is ready. It moves the load back when the mains returns.

What is the difference between an ATS and a changeover switch?

A changeover switch is usually operated by hand. An ATS does the same job automatically. Both must keep the set and the mains apart.

How is an ATS tested?

By moving the building load onto the set and back again, at a time agreed with you, and checking the panel settings and signals along the way.

Can a generator back-feed the grid through the switch?

A correctly designed and maintained changeover stops it. BS 7671 Section 551 covers this, and sets designed to run in parallel need the network operator’s involvement under G99.

Can you fit a new switch to an old set?

Often, yes, provided the set’s controller can take a remote start signal. An engineer can confirm on site.

Sources for this page

Ask for a quote for your generator

We look for one service engineer who works in your area and tell you who they are before any of your details go to them. You pay nothing for this.

  1. You tell us where the set is and what it needs.
  2. We name an engineer who covers your site.
  3. You say yes or no before your details are passed on.
  4. They quote in writing, directly to you.

Step 1 of 3

Where is the generator?
Get a quote